JSC TGC-1 summarized its operational results

27 July 2011

In comparison with the similar period of 2010 the volume of electric energy output produced by the generating enterprises of the Company, including Murmanskaya CHPP, for 6 months of the current year has increased on 4.8 % and has made 15,132 million kW/h. In connection with commission of two new CCGTs at Pervomayskaya and Yuzhnaya CHPP the output of CHPPs of the Company increased 14.6 % to 8,807 million kW/h. In connection with low water content in the first half of 2011 the output of HEPP of the Company decreased on 6.3 % to 6,325 million kW/h.

Electric capacity utilization factor of JSC TGC-1 in bulk has remained at the level of the first half of 2010 – 52.6 %, thus electric capacity utilization factor of CHPP has increased 2.9 % to 54.6 %, and electric capacity utilization factor of HEPP has decreased 3.5 % to 50.1 %.

Heat output (taking into account Murmanskaya CHPP) has made 16,131 thous. GCal that is 5.4 % below the indicator for the similar period of colder 2010.

Full operational results can be found on corporate website in Reports section.