Company News

9 November 2018 года

TGC-1 Group Profit for 9M 2018 Increased by 26.3%

TGC-1 releases interim unaudited consolidated Financial Statements for the 9 months period, ended 30 September 2018 prepared in accordance with International Financial Reporting Standards (IFRS).

9 November 2018 года

TGC-1's Vyborgskaya CHPP put an environmental monitoring system into pilot operation

Vyborgskaya CHPP's environmental monitoring system was launched in the mode of pilot and field testing

7 November 2018 года

Full repair of a hydroelectric generating unit is completed at TGC-1's Putkinskaya HPP

As part of the Power System Repair and Maintenance Programme implementation, the full repair of hydroelectric generating unit No. 2 of Putkinskaya HPP was completed

26 October 2018 года

TGC-1 increased RAS net profit by 17.6% for 9 months of 2018

TGC-1 published its 9 months 2018 financial statements under the Russian Accounting Standards (RAS).

26 October 2018 года

TGC-1 Presents its performance highlights for 9 months of 2018

Electricity generation of TGC-1 for 9 months of 2018, including PJSC Murmanskaya CHPP, comprised 21,555.1 million kWh, which is 3.2% more than in the respective period of 2017.

25 September 2018 года

The impeller dismantled at Verkhne-Tulomskaya HPP of TGC-1

On 25 September 2018, the impeller of the hydroelectric generating unit No. 4 was dismantled as part of the upgrade of TGC-1's Verkhne-Tulomskaya HPP

20 September 2018 года

S&P Global Ratings raised TGC-1 long- and short-term issuer credit ratings to “BBB-/A-3”

On 20 September 2018, Standard & Poor’s Global Ratings raised its long- and short-term issuer credit ratings on TGC-1 to “BBB-/A-3”. The outlook is stable.

12 September 2018 года

Fitch Ratings upgrades TGC-1 long-term ratings to “BBB-”

On 11 September 2018, Fitch Ratings has upgraded long-term Issuer Default Ratings (IDR) of TGC-1 in foreign and national currency to “ВВB-” level, Outlook Stable, and short-term Issuer Default Ratings in foreign and national currency to “F3” level.

12 September 2018 года

Apatitskaya CHPP of TGC-1 switched to winter mode of operation

Apatitskaya CHPP of TGC-1 being the only heat supply source of the cities of Apatity and Kirovsk of Murmansk Oblast, switched to winter mode of operation

1 September 2018 года

Gazprom Class opened in Gymnasium No. 426 with the support of TGC-1 and ETU "LETI"

Grand opening of Gazprom Class took place in the State budget educational institution Gymnasium No. 426 in St. Petersburg on September 1