Based on the results of payments for heat and hot water supply in 2015, JSC TGC-1 thanked its consumers in St. Petersburg who demonstrated good payment discipline. Exemplary payers were chosen among management companies, homeowners' associations, and industrial enterprises.
JSC TGC-1 has summed up the results of its business operations over 2015.
The overall electricity generation by TGC-1, including Murmanskaya CHPP, for the year of 2015, reduced by 2.3% to 25,811 million kWh comparing to 2014.
Overhaul repaid of the hydro generating unit No. 2 was completed at Khevoskoski HPP of TGC-1’s Paz HPPs Cascade. Power engineers provided renovation of the speed regulator and oil pressure unit.
JSC TGC-1 is inviting the citizens of Petrozavodsk to visit an open ice rink. Every Sunday starting from January 24 until the end of February, various master-classes, games, and other sport events will take place in Gubernatorsky park.
JSC TGC-1 Suna HPPs Cascade employees completed the two-year sweeping rebuild of Palyeozerskaya HPP and launched hydroelectric unit No. 1. Conventional hydroelectric unit control system running on oil pressure equipment was replaced with a new small electrocylinder control system. Two months ago, a similar control system was installed on hydroelectric unit No. 2.
Dec. 28, 2015 marks the 55th anniversary of the launch of JSC TGC-1 Iovskaya HPP located in Zarechensk settlement in the southern part of the Murmansk Oblast.
Employees of the Kem HPPs Cascade, the most powerful Cascade in Karelia, launched the third hydroelectric unit at Putkinskaya HPP after excitation system replacement. Cutting edge microprocessor equipment ensures uninterrupted electricity generation in all operational modes and monitors generator status.