Company News

08 February 2016

JSC TGC-1 Says Thank You to Consumers who Pay for Heat on a Timely Basis

Based on the results of payments for heat and hot water supply in 2015, JSC TGC-1 thanked its consumers in St. Petersburg who demonstrated good payment discipline. Exemplary payers were chosen among management companies, homeowners' associations, and industrial enterprises.

29 January 2016

Electricity generation at HPPs of JSC TGC-1 increased by 7.7% over 2015

JSC TGC-1 has summed up the results of its business operations over 2015.

The overall electricity generation by TGC-1, including Murmanskaya CHPP, for the year of 2015, reduced by 2.3% to 25,811 million kWh comparing to 2014.

25 January 2016

JSC TGC- completed implementation of the technological information exchange system in the Murmansk Oblast

Technological information system for exchange with the automated system operator system was commissioned at the TGC-1’s Borisoglebskaya HPP.

18 January 2016

Overhaul of a hydro generating unit completed at JSC TGC-1 Paz HPPs Cascade

Overhaul repaid of the hydro generating unit No. 2 was completed at Khevoskoski HPP of TGC-1’s Paz HPPs Cascade. Power engineers provided renovation of the speed regulator and oil pressure unit.

15 January 2016

A skating rink in Gubernatorsky park becomes a winter art-space

JSC TGC-1 is inviting the citizens of Petrozavodsk to visit an open ice rink. Every Sunday starting from January 24 until the end of February, various master-classes, games, and other sport events will take place in Gubernatorsky park.

29 December 2015

JSC TGC-1 Completes Sweeping Rebuild of Palyeozerskaya HPP

JSC TGC-1 Suna HPPs Cascade employees completed the two-year sweeping rebuild of Palyeozerskaya HPP and launched hydroelectric unit No. 1. Conventional hydroelectric unit control system running on oil pressure equipment was replaced with a new small electrocylinder control system. Two months ago, a similar control system was installed on hydroelectric unit No. 2.

28 December 2015

Iovskaya HPP Turns 55

Dec. 28, 2015 marks the 55th anniversary of the launch of JSC TGC-1 Iovskaya HPP located in Zarechensk settlement in the southern part of the Murmansk Oblast.

25 December 2015

Tuloma and Serebryanskiye HPPs Cascade Museum Opens in Murmashi

On December 25, 2015, the Tuloma and Serebryanskiye HPPs Cascade museum opened in Murmashi at JSC TGC-1 Nizhnetulomskaya HPP.

25 December 2015

Yaniskoski HPP Turns 65

December 26, 2015 marks the 65th anniversary of the launch of JSC TGC-1 Yaniskoski HPP.

24 December 2015

JSC TGC-1 Completes Large-Scale Overhaul of Three Hydroelectric Units at Putkinskaya HPP

Employees of the Kem HPPs Cascade, the most powerful Cascade in Karelia, launched the third hydroelectric unit at Putkinskaya HPP after excitation system replacement. Cutting edge microprocessor equipment ensures uninterrupted electricity generation in all operational modes and monitors generator status.