Company News

13 May 2014

2013-2014 heating season results for JSC TGC-1 plants in St Petersburg.

JSC TGC-1 released the results for the Company’s thermal power plants, which supplied heat to the residents, businesses and companies of St Petersburg and the Leningrad Oblast during the 2013-2014 autumn-winter period.

08 May 2014

A new historical site has been created, thanks to the power engineers in Petrozavodsk

As part of the Victory Day celebrations, Karelian veterans and power engineers, and staff from JSC TGC-1 staged a flower-laying ceremony at an historical site that is new for Petrozavodsk.

06 May 2014

TGC-1 power engineers honor the memory of the Great Patriotic war heroes

On 6 May 2014, as a tribute to the heroism of the besieged inhabitants of Leningrad, representatives from the council of veterans and the youth activists council at JSC TGC-1 laid flowers at the Pulkovo Line memorial.

05 May 2014

JSC TGC-1 net profit up by 4.9% for Q1 2014, according to Russian Accounting Standards

JSC TGC-1 is reporting its financial statements for the first 3 months of 2014, which have been compiled in accordance with the Russian Accounting Standards.

05 May 2014

JSC TGC-1 presents its operating results for Q1 2014

JSC TGC-1 is reporting its operating results for Q1 2014.

05 May 2014

JSC TGC-1 organized a series of workshops – ‘Living Energy’

On May 1 and 4, JSC TGC-1 experts and engineers told young Petersburgers and their parents about the benefits of energy efficiency and resource conservation.

30 April 2014

JSC TGC-1 staged an energy marathon for Petersburg school children

On April 30, 2014, at the venue for the International Children’s Design, Fine and Applied Art Competition, ‘The Room of My Dreams’ the JSC TGC-1 energy marathon got underway.

28 April 2014

Comprehensive testing of new integrated switchgear in progress at Russia’s oldest power plant

At the JSC TGC-1 Tsentralnaya CHPP power plant №2, construction of the building for closed 110/6 kV integrated switchgear with SF insulation is now complete.

25 April 2014

Tours for children at HPPs and CHPPs of the JSC TGC-1 Kolskiy Branch

On 24 April 2014, pupils from the 4th class of the Minkinskaya Special Comprehensive Residential School, visited the JSC TGC-1 Nizhne-Tulomskaya HPP in the village of Murmashi.

24 April 2014

Impeller wheel for Hydroelectric Unit № 2 delivered to the JSC TGC-1 Iovskaya HPP

to the JSC TGC-1 Iovskaya HPP from Austria. The equipment, manufactured at the ANDRITZ Hydro GmbH plant (Graz, Austria), travelled along a route which led from Austria (Graz), to Belarus, and then Russia (Moscow) and finally to the Iovskaya HPP (Zarechensk, Murmansk oblast).