Company News

25 September 2018

The impeller dismantled at Verkhne-Tulomskaya HPP of TGC-1

On 25 September 2018, the impeller of the hydroelectric generating unit No. 4 was dismantled as part of the upgrade of TGC-1's Verkhne-Tulomskaya HPP

20 September 2018

S&P Global Ratings raised TGC-1 long- and short-term issuer credit ratings to “BBB-/A-3”

On 20 September 2018, Standard & Poor’s Global Ratings raised its long- and short-term issuer credit ratings on TGC-1 to “BBB-/A-3”. The outlook is stable.

12 September 2018

Fitch Ratings upgrades TGC-1 long-term ratings to “BBB-”

On 11 September 2018, Fitch Ratings has upgraded long-term Issuer Default Ratings (IDR) of TGC-1 in foreign and national currency to “ВВB-” level, Outlook Stable, and short-term Issuer Default Ratings in foreign and national currency to “F3” level.

12 September 2018

Apatitskaya CHPP of TGC-1 switched to winter mode of operation

Apatitskaya CHPP of TGC-1 being the only heat supply source of the cities of Apatity and Kirovsk of Murmansk Oblast, switched to winter mode of operation

01 September 2018

Gazprom Class opened in Gymnasium No. 426 with the support of TGC-1 and ETU "LETI"

Grand opening of Gazprom Class took place in the State budget educational institution Gymnasium No. 426 in St. Petersburg on September 1