2010

  • At the Vuoksinskie Cascade HPPs were commissioned two hydraulic units with a total capacity of 60 MW, which reduced oil consumption by half by reducing leakage through the standard blade and a 30% lower intake of water for technical needs.
  • At the Pravoberezhaya CHPP, work continues on the construction of Cooling Tower No. 2, which has completely stopped dumping sewage into open bodies of water.
  • At Avtovskaya CHPP a project and research work and installation of fish protection devices is underway at the water intake of the Bolshoi Turukhtannyi Basin of the Gulf of Finland.
  • The Pravoberezhnaya, Vyborgskaya and the Severnaya CHPPs are equipped for temporary storage of waste.
  • For the structural units of the Nevsky branch a number of containers for temporary storage of waste were acquired.