2014

In 2014 JSC TGC-1 invested funds to the following environmental activities:

 

  • Environmental survey for reconstruction of sewage system, including installation of custody transfer meters and construction of treatment facilities at the discharge point of PP-2 at Centralnaya CHPP of the Nevskiy Branch into the city collector and the Neva river
  • Environmental survey for reconstruction of sewage system, arrangement of liquid sludge dewatering at water purification plant and construction of local treatment facilities at the discharge point of Pravoberezhnaya CHPP of the Nevskiy Branch into the city collector
  • Upgrading of fish protection unit at Dubrovskaya CHPP of the Nevskiy Branch
  • Installation of wastewater meters at Pervomaiskaya CHPP of the Nevskiy Branch
  • Environmental survey for reconstruction of sewage system, including stream flow separation and construction of treatment facilities at the discharge point of PP-2 at Avtovskaya CHPP of the Nevskiy Branch into the city collector and the Krasnenkaya river
  • Amendment of environmental survey for performing operations on safe fuel oil storage and discharge from rail tanks of Avtovskaya CHPP of the Nevskiy Branch
  • Environmental survey for construction of wastes accumulation sites at Avtovskaya CHPP of the Nevskiy Branch