2016

In 2016 PJSC TGC-1 invested funds to the following environmental activities:

  • Commencement of reconstruction of sewage system, including stream flow separation and construction of treatment facilities at the discharge point of Avtovskaya CHPP of the Nevskiy Branch into the city collector
  • Commencement of reconstruction of sewage system, including liquid sludge dewatering unit at water purification plant and construction of local treatment facilities at the discharge point of Pravoberezhnaya CHPP of the Nevskiy Branch into the city collector
  • Commencement of reconstruction of sewage system, including installation of custody transfer meters and construction of treatment facilities at PP-2 of Centralnaya CHPP of the Nevskiy Branch
  • Environmental survey for construction of technical water recycling system at Avtovskaya CHPP of the Nevskiy Branch
  • Continued performance of operations on safe fuel oil storage and discharge from rail tanks of Avtovskaya CHPP of the Nevskiy Branch
  • Arrangement of temporary of wastes storage sites at Yuzhnaya CHPP of the Nevskiy Branch
  • Commencement of reconstruction of sewage system, including construction of treatment facilities for wastewater from Vasileostrovskaya CHPP of the Nevskiy Branch
  • Arrangement of wastewater metering units at Poduzhemskaya HPP and Krivoporozhskaya HPP of the Kem HPPs Cascade of the Karelskiy Branch
  • Installation of wastewater meter at Borisoglebskaya HPP of the Paz HPPs Cascade of the Kolskiy Branch
  • Continuing reconstruction of fish-way at Nizhne-Tulomskaya HPP of the Tuloma and Serebryanskiye HPPs Cascade of the Kolskiy Branch
  • Equipment of wastewate outlets with metering units at Narvskaya HPP, Nizhne-Svirskaya HPP and Verkhne-Svirskaya HPP