Transit pipeline renovation at Anokhin Street in Petrozavodsk
2014—2016
Upgrade Effects
The upgrade allowed to improve the hydraulic mode of heating grid and positively affected consumer's heat supply. All projects involved reducing heat losses and reducing the probability of outbreaks during the upgrade.
During the works, urethane-foam insulated pipes were used. Remote operational control system was implemented over the course of the works which improved the quality of system status diagnosis.